NUMERICAL MODELLING STUDIES TO BE CARRIED OUT WITH REFERENCE TO THE HEADRACE TUNNEL OF KISHANGANGA HYDROELECTRIC PROJECT WHICH IS TO BE EXCAVATED IN THE NEAR FUTURE BY USING A DUBLE SHIELD TBM
Durata:
1 mesi (2009)
Responsabile scientifico:
Tipo di contratto:
Consulenza commerciale
Strutture coinvolte
Partner
- HALCROW GROUP LIMITED