NUMERICAL MODELLING STUDIES TO BE CARRIED OUT WITH REFERENCE TO THE HEADRACE TUNNEL OF KISHANGANGA HYDROELECTRIC PROJECT WHICH IS TO BE EXCAVATED IN THE NEAR FUTURE BY USING A DUBLE SHIELD TBM
Duration:
1 months (2009)
Principal investigator(s):
Contract type:
Consulting
Structures
Partners
- HALCROW GROUP LIMITED