Research database

MIDAS - JTI-CS2-2017-CfP07-SYS-03-14

Duration:
37 months (2021)
Principal investigator(s):
Project type:
UE-funded research - JTI - Clean Sky
Funding body:
COMMISSIONE EUROPEA
Project identification number:

Abstract

The main objective of the MIDAS project is to design and manufacture a smart and fully integrated air data probe (ADP) for SAT applications, characterized by the following features: • reduced size and weight; • reduced power consumption; • improved reliability; • fully-integrated with the onboard communication bus; • fault tolerant, thanks to the health monitoring functionalities: The ADP will be delivered after: • a thorough test campaign for verification and validation of the manufactured system; • environmental requirement verification (Temperature, Vibration, Icing, EMI/EMC). Quality is ensured by the documented traceability of measurement results. In order to achieve these targets, the solution will include key enabling innovative technologies such as: • single Line-Replaceable Unit (LRU) with the capability of communicating with other FBW control system devices through a standard legacy (e.g. Arinc429, CanBUS Arinc825) and innovative communication bus (e.g. AFDX). As a further step it may be evaluated the introduction of a AFDX over fibre link channel to furtherly drastically reduce wiring weight on the aircraft, signals crosstalk and susceptibility and to increase the overall system reliability; • optimized fail-safe architecture; • innovative air data strategies to implement virtual sensors with the aim to reduce the use of physical probes; • redundant power supply and advanced health monitoring (hardware and software) based on previous partners’ experience exploiting power-up, initiatial and continuous built-in test; • advanced air data algorithms focused on air data system optimization, based on partners’ previous experience; • anti-ice capability using automatic heater in order to avoid holes occlusion due to ice formation; • complete sensors characterisation, calibration and target uncertainty evaluation.

Structures

Budget

Total cost: € 1,154,375.00
Total contribution: € 948,687.50
PoliTo total cost: € 373,750.00
PoliTo contribution: € 373,750.00