Research database

MATERIALIZED - MATErial Rheology Investigation And LIfecycle assessment of a Zero Emission Driving system

Duration:
11/12/2023 - 10/02/2025
Principal investigator(s):
Project type:
PNRR – Mission 4
Funding body:
MINISTERO (MUR)
Project identification number:
ECS_00000036
PoliTo role:
Sole Contractor

People involved

Structures

Keywords

ERC sectors

PE7_2 - Electrical engineering: power components and/or systems
PE7_3 - Simulation engineering and modelling
PE7_11 - Components and systems for applications (in e.g. medicine, biology, environment)
PE8_11 - Sustainable design (for recycling, for environment, eco-design)
PE7_1 - Control engineering

Sustainable Development Goals

Obiettivo 7. Assicurare a tutti l’accesso a sistemi di energia economici, affidabili, sostenibili e moderni|Obiettivo 13. Promuovere azioni, a tutti i livelli, per combattere il cambiamento climatico*

Budget

Total cost: € 130,652.61
Total contribution: € 130,652.61
PoliTo total cost: € 130,652.61
PoliTo contribution: € 130,652.61