Research database

HIBS - Highly Integrated Battery Systems

Duration:
01/04/2023 - 30/09/2026
Principal investigator(s):
Project type:
Corporate-funded and donor-funded research
Funding body:
PRIVATI (CRF-Stellantis)
PoliTo role:
Sole Contractor

Abstract

The project's objective is to optimize the gravimetric and volumetric energy density of battery systems for vehicular applications by developing a cell-to-pack architecture characterized by thermal management based on immersive cooling. The study is also focused on the structural optimization of the battery casing and the development of a wireless architecture for the Battery Management System. New techniques for the pressure and temperature measurement in the pack will be developed.

Structures

Keywords

ERC sectors

PE8_7 - Mechanical and manufacturing engineering (shaping, mounting, joining, separation)

Sustainable Development Goals

Obiettivo 11. Rendere le città e gli insediamenti umani inclusivi, sicuri, duraturi e sostenibili

Budget

Total cost: € 350,000.00
Total contribution: € 350,000.00
PoliTo total cost: € 350,000.00
PoliTo contribution: € 350,000.00