Anagrafe della ricerca

AMPS - Automated Mass Production of SOC Stacks

Durata:
48 mesi (2027)
Responsabile scientifico:
Tipo di progetto:
Ricerca UE - JTI - Clean Hydrogen
Ente finanziatore:
COMMISSIONE EUROPEA
Codice identificativo progetto:
101111882
Ruolo PoliTo:
Partner

Abstract

AMPS project brings together the leading European companies in Solid Oxide Fuel Cell and Solid Oxide Electrolyzer manufacturing value chain. The project includes automation companies (Rocksoft, Smartal) and manufacturing equipment producers (SITEC, Haikutech, Dosetec) as well as cell manufacturer (Elcogen AS) and stack manufacturer (Elcogen oy). The project is motivated by their strong commitment to develop their products and services and commence real mass-manufacturing. The industry partners are supported by research institutes VTT, Polito and VUTS. The high-level AMPS objectives are: 1. Automated high-speed cell production with integrated quality control 2. Automated high-speed interconnect plate production and coating with integrated quality control 3. Automated high-speed stack assembly with integrated quality control 4. Complete component tracking and optimized mass-manufacturing by using virtual twins 5. Assessment and demonstration of target stack manufacturing cost of

Persone coinvolte

Strutture coinvolte

Partner

  • POLITECNICO DI TORINO
  • VTT - TECHNICAL RESEARCH CENTRE OF FINLAND - Coordinatore

Parole chiave

Settori ERC

PE8_6 - Energy processes engineering
PE8_10 - Industrial design (product design, ergonomics, man-machine interfaces, etc.)

Obiettivi di Sviluppo Sostenibile (Sustainable Development Goals)

Obiettivo 7. Assicurare a tutti l’accesso a sistemi di energia economici, affidabili, sostenibili e moderni|Obiettivo 9. Costruire un'infrastruttura resiliente e promuovere l'innovazione ed una industrializzazione equa, responsabile e sostenibile

Budget

Costo totale progetto: € 8.711.520,00
Contributo totale progetto: € 6.606.098,00
Costo totale PoliTo: € 523.750,00
Contributo PoliTo: € 523.750,00