Anagrafe della ricerca

PREDICT-6G - PRogrammable AI-Enabled DeterminIstiC neTworking for 6G

Durata:
24 mesi (2025)
Responsabile scientifico:
Tipo di progetto:
Ricerca UE - HE - Global Challenges - Digital, Industry and Space
Ente finanziatore:
COMMISSIONE EUROPEA
Codice identificativo progetto:
101095890
Ruolo PoliTo:
Partner

Abstract

6G is envisioned to accelerate the path started in 5G for catering to the needs of a wide variety of vertical use cases, both current and emerging. This will require major enhancements of the current 5G capabilities especially in terms of bandwidth, latency, reliability, security, and energy. P R EDICT-6G’s mission is therefore set towards the development of an end-to-end 6G ( e2e ) solution including architecture and protocols that can guarantee seamless provisioning of services for vertical use cases requiring extremely tight timing and reliability constraints. To succeed, the solution will target determinism network infrastructures at large, including wired and wireless segments and their interconnections. P R EDICT-6G will develop a novel Multi-technology Multi-domain Data-Plane ( MDP ) overhauling the reliability and time sensitiveness design features existing in current wired and wireless standards. The ambition is for the MDP design to be inherently deterministic. To achieve this, P R EDICT-6G will develop an AI-driven Multi-stakeholder Inter-domain Control-Plane ( AICP ) for the provisioning of deterministic network paths to support time sensitive services as requested by end- customers and with different scaling ambitions, e.g., from the network in a single vehicle to a large, geographically dispersed network. This requires timely monitoring and prediction of the behavior of the complete network, including identifying potential sources of quality violations and analyzing various routes of the traffic flows. These capabilities will be delivered through the P R EDICT-6G AI- powered Digital Twin ( DT ) framework, allowing the prediction of the behavior of the end-to-end network infrastructure, and enabling anticipative control and validation of the network provisions to meet the real-world time-sensitive and reliability requirements of the running services

Persone coinvolte

Strutture coinvolte

Partner

  • ATOS IT SOLUTIONS AND SERVICES IBERIA SL
  • ATOS SPAIN SA
  • COGNITIVE INNOVATIONS PRIVATE COMPANY
  • CONSIGLIO NAZIONALE DELLE RICERCHE
  • ERICSSON ESPANA SA
  • GESTAMP SERVICIOS SA
  • INTEL DEUTSCHLAND GMBH
  • INTERDIGITAL EUROPE LTD
  • MTU AUSTRALO ALPHA LAB
  • NEXTWORKS
  • NOKIA SOLUTIONS AND NETWORKS KFT
  • POLITECNICO DI TORINO
  • SOFTWARE IMAGINATION & VISION SRL
  • TELEFONICA INVESTIGACION Y DESARROLLO SA
  • UNIVERSIDAD CARLOS III DE MADRID - Coordinatore
  • UNIVERSITAT POLITECNICA DE CATALUNYA (UPC)
Mostra di piùMostra meno

Parole chiave

Settori ERC

PE7_8 - Networks (communication networks, sensor networks, networks of robots, etc.)

Obiettivi di Sviluppo Sostenibile (Sustainable Development Goals)

Obiettivo 9. Costruire un'infrastruttura resiliente e promuovere l'innovazione ed una industrializzazione equa, responsabile e sostenibile

Budget

Costo totale progetto: € 6.427.688,00
Contributo totale progetto: € 5.991.852,00
Costo totale PoliTo: € 477.500,00
Contributo PoliTo: € 477.500,00

Attività di comunicazione