Analysis of the conditioning of the Fontainbleau sand in Paris with a review of the possible hazards to be encountered in the EPB tunneling and with a report on the tests to be carried out at the design stage fot the development of a complete characterization of the conditioning
Duration:
1 months (2021 - 2021)
Principal investigator(s):
Contract type:
Consulting
People involved
- Daniele Peila. (Responsabile Scientifico)