Research database

RESTART - Spoke 5 - RESearch and innovation on future Telecommunications systems and networks, to make Italy more smART” (RESTART) - Spoke 5

Duration:
36 months (2025)
Principal investigator(s):
Project type:
PNRR – Mission 4
Funding body:
MINISTERO (MUR )
Project identification number:
PE0000001
PoliTo role:
Partner

Abstract

The project is about industrial and digital transition networks. The Industrial IoT (IIoT) is among the driving forces of global economic growth in the next decade. IIoT applications need Industrial Networks (IN) connecting machines, robots and workers, characterized by stringent throughput latency, and positioning accuracy requirements. The integration of wired and wireless techniques provide flexibility and scalability, but some use cases require new communication solutions. The project aims at conceiving, studying and testing new IN technologies to boost the development of the National manufacturing industry in the fields of mechatronics, automotive and automation. S9 addresses the following macro-objectives: (i) enabling efficient productivity and flexible/scalable production processes; (ii) ensuring work safety and environmental impact reduction; (iii) improving energy and cost efficiency; (iv) guaranteeing data security. The goals will be achieved by interdisciplinary fundamental research on novel network architectures, communication protocols and signaling techniques, testing research outcomes through IN-relevant PoCS.

People involved

Structures

Partners

  • POLITECNICO DI TORINO - AMMINISTRAZIONE CENTRALE
  • UNIVERSITA' DI ROMA - TOR VERGATA - Coordinator

Keywords

ERC sectors

PE7_8 - Networks (communication networks, sensor networks, networks of robots, etc.)
PE7_9 - Man-machine-interfaces
PE7_2 - Electrical engineering: power components and/or systems

Sustainable Development Goals

Obiettivo 9. Costruire un'infrastruttura resiliente e promuovere l'innovazione ed una industrializzazione equa, responsabile e sostenibile|Obiettivo 11. Rendere le città e gli insediamenti umani inclusivi, sicuri, duraturi e sostenibili

Budget

Total cost: € 8,927,666.00
Total contribution: € 8,927,666.00
PoliTo total cost: € 339,375.37
PoliTo contribution: € 339,375.37