Revision of the study conducted on the Rough gas storage facility to assess the feasibility of its conversion into an H2 storage, with a specific focus on the storage dynamic model
Duration:
2 months (2023)
Principal investigator(s):
Contract type:
Consulting
Structures
Partners
- Exceed Torridon Limited