Research database

IMAGHyNE - IMAGHYNE: INVESTMENT TO MAXIMISE THE AMBITION FOR GREEN HYDROGEN IN EUROPE

Duration:
72 months (2029)
Principal investigator(s):
Project type:
UE-funded research - JTI - Clean Hydrogen
Funding body:
COMMISSIONE EUROPEA (EC)
Project identification number:
101137586
PoliTo role:
Partner

Abstract

IMAGHyNE will pave the way for the deployment of a large-scale renewable hydrogen (H2) economy in the Auvergne-Rhône-Alpes region, fully integrated in the energy system and addressing the needs of high emitting sectors. The objectives will be to: 1) deploy 57 MW of new electrolysis capacity, 2) implement a flexible H2 supply chain combining underground storage and tube-trailer deliveries 3) deploy 13 multi-modal H2 refuelling stations, 4) deploy 203 on-road fuel cell vehicles, 5) deploy 63 off-road fuel cell vehicles and stationary equipment, 6) strengthen the robustness of the energy and H2 supply chain by integrating a flexible industrial player, 7) design an efficient pipeline-based multi-user H2 ecosystem, 8) prepare for additional large-scale deployment as part of the Valley extension (including IPCEI) and its replication, 9) disseminate and communicate the results of the project to a wide audience. IMAGHyNE will meet the requirements of the Work Programme and contribute to the EU’s H2 strategy. IMAGHyNE will foster the development of a long-lasting H2 economy through: 1) an extension of the Valley including the development of a pipeline network and the transition of several industries part of the observer group, 2) an ambitious replication strategy with at least 5 territories from European countries (France, Italy, Spain, Portugal, Switzerland), airports, and mountain ecosystems, 3) high quality communication and dissemination activities including training, 4) recommendations to public authorities on regulation (e.g. tunnels). This ambition will be achieved thanks to the involvement of key public and private entities covering the entire H2 value chain, with an extensive experience of EU-funded projects, who have defined a detailed governance structure, Work Plan and financing strategy. IMAGHyNE partners will work collectively to create links and synergies with upcoming and existing Valleys already supported by the Clean Hydrogen Partnership.

Structures

Partners

  • POLITECNICO DI TORINO
  • REGION AUVERGNE RHONE ALPES - Coordinator

Keywords

ERC sectors

PE8_6 - Energy processes engineering

Sustainable Development Goals

Obiettivo 7. Assicurare a tutti l’accesso a sistemi di energia economici, affidabili, sostenibili e moderni

Budget

Total cost: € 192,164,346.25
Total contribution: € 19,996,911.75
PoliTo total cost: € 225,625.00
PoliTo contribution: € 225,625.00