Research database

SISTER - Sustainable Integrated System for Total non-Exhaust Reduction

Duration:
01/07/2024 - 31/08/2025
Principal investigator(s):
Project type:
PNRR – Mission 4
Funding body:
MINISTERO (MUR)
PoliTo role:
Partner

Abstract

The target of the project is to create an integrated system capable of generating, collecting, and measuring non-exhaust particulate matter (PM) during all stages of tire development, from compound development to vehicle validation, allowing actions to be taken to reduce and mitigate them. The system will include: -A lab machine capable of measuring tire wear PM generation for different tread compound solutions at various severities, temperatures, and surfaces -A measurement station for PM generation from different tires under various conditions on the Indoor Drum Wear machine -An appropriately equipped electric or hybrid car to measure tire wear PM generated both indoors on a vehicle chassis dynamometer and outdoors on a track. The vehicle will have the brake separated from the tire and during outdoor tests it will include a system to discern the source of collected non-exhaust PM among tire wear, road wear, brake wear and resuspension. -Data collection and analysis using most advanced techniques.

People involved

Structures

Partners

  • C.N.R. - CONSIGLIO NAZIONALE DELLE RICERCHE
  • Pirelli Digital Solutions
  • PIRELLI TYRE S.P.A.
  • POLITECNICO DI TORINO - AMMINISTRAZIONE CENTRALE
  • UNIVERSITA' DEGLI STUDI DI NAPOLI FEDERICO II - Coordinator

Keywords

ERC sectors

PE8_7 - Mechanical and manufacturing engineering (shaping, mounting, joining, separation)

Sustainable Development Goals

Obiettivo 11. Rendere le città e gli insediamenti umani inclusivi, sicuri, duraturi e sostenibili

Budget

Total cost: € 4,300,500.00
Total contribution: € 3,206,750.00
PoliTo total cost: € 103,000.00
PoliTo contribution: € 103,000.00