Research database

2DoPe - 2-Degree of freedom Pendulum for wave energy harvesting (2DoPe)

Duration:
6 months (2024)
Principal investigator(s):
Project type:
Corporate-funded and donor-funded research
Funding body:
PRIVATI (CSP)
Project identification number:
120124
PoliTo role:
Sole Contractor

Structures

Keywords

ERC sectors

PE8_7 - Mechanical and manufacturing engineering (shaping, mounting, joining, separation)
PE8_3 - Civil engineering, architecture, maritime/hydraulic engineering, geotechnics, waste treatment
PE7_1 - Control engineering
PE7_2 - Electrical engineering: power components and/or systems
PE7_3 - Simulation engineering and modelling
PE8_6 - Energy processes engineering

Sustainable Development Goals

Obiettivo 7. Assicurare a tutti l’accesso a sistemi di energia economici, affidabili, sostenibili e moderni|Obiettivo 13. Promuovere azioni, a tutti i livelli, per combattere il cambiamento climatico*|Obiettivo 14. Conservare e utilizzare in modo durevole gli oceani, i mari e le risorse marine per uno sviluppo sostenibile

Budget

Total cost: € 49,950.00
Total contribution: € 49,950.00
PoliTo total cost: € 49,950.00
PoliTo contribution: € 49,950.00