Anagrafe della ricerca

MINERVA - Matchless ItaliaN Energy Recovery Vehicle Architecture

Durata:
01/07/2024 - 30/06/2025
Responsabile scientifico:
Tipo di progetto:
PNRR – Missione 4
Ente finanziatore:
MINISTERO (MUR)
Ruolo PoliTo:
Coordinatore

Abstract

The flagship project aims to develop a scaled prototype at TRL 4 of an innovative braking energy recovery system (hereinafter referred to as BRB) for the next Italian sustainable high-performance car of the future, with a new regenerative powertrain with hard braking capability, characterised by the integration of high-energy and high-power cells within the same battery system. Additionally, it aims to develop all necessary BRB subsystems to prepare a functional vehicle by 2026, to achieve a TRL 7. BRB allows reducing the mass of the battery of electric vehicles up to 30% with a dramatic increase in performance in terms of charging time, regenerative power, and energy consumption reduction due to the better capability to recover energy in braking and due to the mass reduction of the vehicle. Two Italian laboratories are involved in the development activities, CNR-STEMS, based in Naples and CARS at Politecnico di Torino. They will acquire cutting-edge technology infrastructures to test innovative battery systems and develop a smallscale prototype to validate all BRB subsystems that will be used to set up the TRL7 vehicle demonstrator. MINERVA will therefore be an enabler for the development of future more efficient electric cars.

Persone coinvolte

Strutture coinvolte

Partner

  • BREMBO SPA
  • C.N.R. - CONSIGLIO NAZIONALE DELLE RICERCHE
  • POLITECNICO DI TORINO - AMMINISTRAZIONE CENTRALE - Coordinatore

Parole chiave

Settori ERC

PE8_7 - Mechanical and manufacturing engineering (shaping, mounting, joining, separation)

Obiettivi di Sviluppo Sostenibile (Sustainable Development Goals)

Obiettivo 9. Costruire un'infrastruttura resiliente e promuovere l'innovazione ed una industrializzazione equa, responsabile e sostenibile

Budget

Costo totale progetto: € 3.513.000,00
Contributo totale progetto: € 2.631.250,00
Costo totale PoliTo: € 657.500,00
Contributo PoliTo: € 657.500,00