Research database

An integrated system that allows quick, effective and trasparent exploration of researchers' expertise, by making available data on scientific production, research projects, patents and other relevant information. Through the search function, it's possible to discover research areas, people, and results of the research conducted at Politecnico di Torino.

POLY-RAPID - EXPLOITING FRONTAL POLYMERIZATION TECHNIQUES FOR THE EFFICIENT AND RAP-ID CURING OF EPOXY-BASED COMPOSITES

Duration:
Unknown date - Unknown date
Principal investigator(s):
Project type:
Non-EU international research
Funding body:
ALTRO INTERNAZIONALE ( FFG, Austrian Funding Agency (Austrian Government))
Project identification number:
0000
PoliTo role:
Partner

Abstract

The project is dedicated to the development of well-controlled frontal polymerization routes for (i) the rapid production of high-performance thermosets, (ii) the reduction of energy (improving carbon foot-print) and production costs and (iii) realizing higher through-put rates by reducing cure cycles. At the same time the new curing process via frontal polymerization should be compatible with classic manu-facturing techniques (e.g. vacuum infusion and filament winding) and should produce high-quality thermoset materials with thermo-mechanical properties that are comparable to or even better than traditional epoxy-amine or epoxy-anhydride thermosets.

Structures

Partners

  • FACC Operations GmbH
  • Magna Steyr Fuel Systems GmbH
  • Montanuniversitaet Leoben / Institute of Chemistry of Polymeric Materials
  • Montanuniversitaet Leoben / Institute of Materials Science and Testing of Polymers
  • POLITECNICO DI TORINO - AMMINISTRAZIONE CENTRALE
  • Politecnico di Torino-DISAT
  • POLYMER COMPETENCE CENTER LEOBEN GmbH-PCCL - Coordinator

Keywords

ERC sectors

PE5_15 - Polymer chemistry
PE8_8 - Materials engineering (metals, ceramics, polymers, composites, etc.)

Sustainable Development Goals

Obiettivo 12. Garantire modelli sostenibili di produzione e di consumo

Budget

Total cost: € 700,000.00
Total contribution: € 420,000.00
PoliTo total cost: € 60,000.00
PoliTo contribution: € 40,000.00