An integrated system that allows quick, effective and trasparent exploration of researchers' expertise, by making available data on scientific production, research projects, patents and other relevant information. Through the search function, it's possible to discover research areas, people, and results of the research conducted at Politecnico di Torino.
REMOTE - FCH-02-12-2017
Duration:
Principal investigator(s):
Project type:
Funding body:
Project identification number:
Abstract
EMOTE will demonstrate technical and economic feasibility of two fuel cells-based H2 energy storage solutions (integrated P2P system; non-integrated P2G+G2P system), deployed in 4 DEMOs, based on renewables, in isolated micro-grid or off grid remote areas. DEMO 1: Ginostra (South Italy): off-grid configuration (island); RES based on hybrid system with PV- generators; residential loads on-site; almost complete substitution of fossil fuels. End-user: ENEL Green Power utility; DEMO 2: (Greece): isolated micro-grid application; RES based on hydro generators; industrial (SME) loads onsite; complete substitution of fossil fuels; avoid costs for new transmission line. End-user: Horizon SA owner of hydro plant; DEMO 3: Ambornetti (North Italy): off-grid configuration (remote Alps); RES based on hybrid system with PV-biomass CHP generators; residential loads on-site; complete substitution of fossil fuels. End-user: IRIS stakeholder of the hamlet; DEMO 4: Froan Island (Norway): isolated micro-grid application; RES based on hybrid system with PV-wind generators; residential loads+ fish industry on-site; complete substitution of fossil fuels; avoid costs for new transmission line. End-user: Trønder Energi utility. VALIDATE the 4 DEMO units, to enable suppliers, end-users and general stakeholders to gain experience throughout the value chain of the energy storage; DEMOSTRATE the added value of the fuel cell-based H2 energy storage solutions with respect to alternative technologies in terms of economics, technical and environmental benefits; VALIDATE EU-based sub-MW P2P manufacturing solutions to fill the gap in the European energy storage sector while utilising the existing EU know-how already developed in previous consortium among partners; EXPLOITATION and BUSINESS scenarios for the replication of P2P solutions, considering different typologies of micro-grids (isolated or not); DISSEMINATION, build up confidence among stakeholders and raise public interest.
Structures
Budget
| Total cost: | € 6,789,307.50 |
|---|---|
| Total contribution: | € 4,995,950.25 |
| PoliTo total cost: | € 437,500.00 |
| PoliTo contribution: | € 437,500.00 |